Our Friend of the Path, Richard Sugiyama, provides historical perspectives on the construction of Ke Ala Hele Makalae over the years.
Happy Holidays! New estimated completion near June 2011.
An overlook view of the bridge construction from the south.
From the south shore of Wailua River you can see that the structural Acrow sections have been completed over the river to the north bank.
All of the exposed concrete surfaces will be covered with lava rock veneer enhancing the look of the bridge.
The road surface planks are being installed over the Acrow sections. At the time of these photos, approximately half of the bridge is covered.